Commercial GlazingSince 2004

Glass that performs. Crews that show up.

0.0M+
Sq ft of glass installed
Across 14 states
0
Commercial projects completed
Office · Retail · Industrial
0.0 days
Avg. ahead of schedule
Per project, 2022–2025
0%
Energy-cost reduction
Client audits, retrofit projects

Completed installations — each one wider than the last.

Project 01Dental Office
Interior of a modern dental office looking out through clean floor-to-ceiling glass windows onto a landscaped courtyard at golden hour

Lakeside Dental & Oral Surgery

Columbus, OH

Single-story medical office retrofit. Replaced 34 single-pane windows with thermally-broken aluminum frames and triple-glazed insulated units — patient comfort audibly improved before the last pane was in.

Pane dimensions72" × 96" IGU
Thermal ratingU-0.22 / SHGC 0.27
Total glass area2,840 sq ft
Install timeline11 days (3 ahead)
SystemKawneer 1600 Wall System
Project 02Mixed-Use
Interior view of a three-story mixed-use building lobby looking through a large glass curtain wall facade toward a sunlit urban street

The Meridian — Three-Story Retail + Office

Nashville, TN

Street-level storefronts in structural silicone glazing; floors two and three in unitized curtain wall. The brief was legibility from the sidewalk and silence from the HVAC — delivered on both.

Pane dimensionsUnitized 60" × 144"
Thermal ratingU-0.19 / SHGC 0.23
Total glass area18,400 sq ft
Install timeline38 days (5 ahead)
SystemOldcastle UniWall Series
Schedule a Site WalkFree. No commitment. 45 minutes on site.
Project 03Corporate Campus
Wide interior shot of a corporate office building lobby with floor-to-ceiling glass curtain wall revealing a city skyline at dusk, amber light flooding the polished concrete floor

Halcyon Group HQ — Full Curtain Wall

Charlotte, NC

Eight-story headquarters, 62,000 sq ft of continuous curtain wall glazing on three elevations. Structural engineering coordination, blast-rated panels on floors 1–2, electrochromic tinting on the south façade. Completed two weeks ahead of the GC's schedule.

Pane dimensionsCustom 48"–84" × 168"
Thermal ratingU-0.17 / SHGC 0.21
Total glass area62,000 sq ft
Install timeline84 days (14 ahead)
SystemWausau SG451T Curtain Wall

From first measurement to signed certificate — four steps, no surprises.

Most glazing delays happen before the first pane is cut. We front-load the precision so the install is the easy part.

01

Site Walk & Measure

We send a licensed estimator — not a salesperson — to take field dimensions, assess existing framing, and identify any structural or code considerations before quoting.

02

Specification & Submittal

Engineering submittals, thermal performance calculations, and shop drawings delivered within 5 business days. Architects and GCs get the documentation they need to keep the project moving.

03

Fabrication & Logistics

Glass cut to field dimensions at our regional fabrication partners. We coordinate delivery windows to match your construction schedule — no glass sitting on-site for weeks.

04

Install & Certify

Crews arrive when the schedule says they arrive. Every installation is tested for air and water infiltration per ASTM E283/E331. You get a signed performance certificate at closeout.

What property teams say after the last pane goes in.

4 years, 9 projects
We manage eleven buildings in the Columbus metro. Glazing subs cancel, show up short-staffed, or cut corners on caulking. Glaze has never done any of those things in four years of work together.
Renata Okafor
VP of Property Operations · Midland Asset Group
6 days early, $18K saved
I put Glaze on the bid list for a 40,000 sq ft retail center and they came in mid-range on price and first on schedule confidence. That confidence was earned — they finished 6 days early.
Marcus Delacroix
Senior Project Manager · Vantage Construction Partners
29% energy reduction
Our energy auditor flagged the 1989 single-pane system as the single biggest cost leak in the facility. Post-retrofit energy bills dropped 29% in the first billing cycle. The ROI math was obvious.
Sasha Bernstein
Director of Facilities · Nexford Life Sciences, Charlotte

Schedule a Site Walk.

A licensed estimator comes to your property, takes field measurements, and identifies any framing or structural considerations. 45 minutes. No charge. No commitment.

Licensed & insured in 14 states
ASTM E283/E331 certified installs
Submittals delivered within 5 business days
Average 4.2 days ahead of schedule